Fleckner und Simon Informationstechnik GmbH http://www.FlecSim.de
Work
Products Index
Work Products by Name A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
WP Name | WP ID | Process |
Acceptance criteria | 18-01 | ACQ12 |
Acceptance record | 13-01 | ACQ4 SUP7 |
Analysis report | 15-01 | ACQ4 ENG1 ENG2 ENG4 MAN6 SUP4 SUP9 |
Assessment/audit report | 15-13 | PIM3 REU2 SUP4 |
Benchmarking data | 03-03 | MAN6 |
Build list | 17-02 | ENG7 |
Change control record | 13-21 | ACQ11 ENG1 ENG2 ENG4 SUP10 |
Change history | 14-01 | ACQ11 SUP7 SUP8 |
Change management plan | 08-28 | ACQ11 SUP10 |
Change request | 13-16 | ACQ4 MAN3 PIM3 SUP1 SUP2 |
Commitment / agreement | 02-01 | ACQ12 ACQ14 ACQ4 PIM3 SPL1 |
Communication record | 13-04 | ACQ4 ACQ11 ENG1 ENG2 PIM3 MAN3 PIM3 REU2 SPL1 SUP1 SUP2 SUP4 |
Configuration item | 01-00 | SUP8 ENG3 |
Configuration management library | 16-03 | SUP8 |
Configuration management plan | 08-04 | SUP8 |
Configuration management record | 13-10 | SUP8 |
Configuration status report | 15-03 | SPL2 |
Contract | 02-00 | ACQ12 ACQ13 |
Contract review record | 13-05 | SUP4 |
Corrective action register | 14-02 | ACQ11 ACQ12 ACQ15 MAN3 MAN5 SUP2 SUP4 |
Customer manual | 06-01 | SPL2 |
Customer request | 13-17 | ACQ4 ACQ11 |
Customer requirements | 17-03 | ACQ11 ENG1 |
Customer satisfaction data | 03-04 | MAN6 |
Customer satisfaction survey | 07-01 | MAN6 |
Data | 03-00 | (unreferenced) |
Delivery record | 13-06 | SPL2 SUP8 |
Design | 04-00 | (unreferenced) |
Documentation plan | 08-26 | SUP7 |
Documentation requirements | 17-05 | SUP7 |
Domain architecture | 04-02 | REU2 |
Domain model | 04-03 | REU2 |
Evaluation report | 15-05 | MAN6 PIM3 SUP9 |
Field measure | 07-02 | MAN6 |
Goals | 05-00 | PIM3 |
Handling and storage guide | 06-02 | SUP8 |
Improvement opportunity | 15-16 | ACQ15 PIM3 SUP4 |
Improvement plan | 08-29 | PIM3 |
Integrated Software | 01-50 | ENG7 |
Application Parameter | 01-50 | ENG2 ENG4 |
Interface requirements specification | 17-08 | ENG2 ENG4 |
Measure | 07-00 | (unreferenced) |
Meeting support record | 13-09 | ACQ4 SUP4 |
Personnel performance data | 03-05 | MAN6 |
Personnel performance measure | 07-03 | MAN6 PIM3 |
Plan | 08-00 | PIM3 |
Policy | 09-00 | (unreferenced) |
Preferred suppliers register | 14-05 | ACQ15 |
Problem management plan | 08-27 | SUP9 |
Problem record | 13-07 | SUP1 SUP2 SUP4 SUP9 |
Problem status report | 15-12 | SUP9 |
Process description | 10-00 | ACQ12 PIM3 |
Process measure | 07-04 | MAN6 |
Process performance data | 03-06 | MAN6 |
Process performance report | 15-18 | MAN6 |
Process repository | 16-06 | PIM3 |
Product | 11-00 | (unreferenced) |
Product release approval record | 13-13 | SPL2 SUP8 |
Product release criteria | 18-06 | SPL2 |
Product release information | 11-03 | SPL2 |
Product release package | 11-04 | SPL2 |
Progress status record | 13-14 | ACQ4 MAN3 |
Project activity network | 08-06 | MAN3 |
Project measure | 07-05 | MAN6 |
Project plan | 08-12 | MAN3 SPL1 |
Project status report | 15-06 | MAN3 |
Proposal | 12-00 | (unreferenced) |
Proposal review record | 13-15 | SPL1 |
Quality criteria | 18-07 | SUP1 SUP2 |
Quality measure | 07-06 | MAN6 |
Quality plan | 08-13 | SUP1 |
Quality record | 13-18 | SUP1 SUP2 |
Record | 13-00 | ENG1 SUP8 |
Recovery plan | 08-14 | MAN5 SUP8 |
Register | 14-00 | (unreferenced) |
Release plan | 08-16 | ENG2 ENG4 SPL2 |
Report | 15-00 | (unreferenced) |
Repository | 16-00 | (unreferenced) |
Request for proposal | 12-01 | ACQ14 |
Requirement specification | 17-00 | ACQ11 ACQ12 ACQ13 ACQ14 |
Reuse evaluation report | 15-07 | REU2 |
Reuse plan | 08-17 | REU2 |
Reuse policy | 09-03 | REU2 |
Reuse proposal | 12-03 | REU2 |
Reuse strategy | 19-05 | REU2 |
Review plan | 08-18 | (unreferenced) |
Review record | 13-19 | ACQ4 ACQ13 MAN3 SPL1 SUP4 SUP7 |
Risk action request | 13-20 | ACQ13 MAN5 |
Risk analysis report | 15-08 | MAN5 |
Risk management plan | 08-19 | ENG1 MAN3 MAN5 |
Risk measure | 07-07 | MAN5 MAN6 |
Risk mitigation plan | 08-20 | MAN5 |
Risk status report | 15-09 | MAN5 |
Schedule | 14-06 | MAN3 |
Service level measure | 07-08 | MAN6 |
Software architecture design | 04-04 | ENG5 |
Software detailed design | 04-05 | ENG5 |
Software item | 01-03 | ENG7 |
Software requirements specification | 17-11 | ENG4 |
Software unit | 11-05 | ENG6 |
Stakeholder groups list | 14-50 | ACQ11 |
Standard | 18-00 | (unreferenced) |
Strategy | 19-00 | (unreferenced) |
Supplier evaluation report | 15-21 | ACQ15 |
Supplier proposal response | 12-04 | SPL1 |
Supplier qualification criteria | 18-50 | ACQ15 |
System | 11-06 | ENG9 |
System architecturedesign | 04-06 | ENG3 |
System requirements specification | 17-12 | ENG2 |
Technology monitoring plan | 08-51 | ACQ11 |
Template | 20-00 | SUP7 |
Temporary solution | 11-07 | SPL2 |
Test plan | 08-52 | ENG6 ENG7 ENG8 ENG9 ENG10 |
Test result | 13-50 | ENG6 ENG7 ENG8 ENG9 ENG10 |
Test specification | 08-50 | ENG6 ENG7 ENG8 ENG9 ENG10 |
Traceability record | 13-22 | ENG2 ENG3 ENG4 ENG5 ENG6 ENG7 ENG8 ENG9 ENG10 |
Tracking system | 14-08 | MAN5 SUP4 |
Training material | 06-04 | PIM3 |
User documentation | 06-00 | (unreferenced) |
Validation results | 13-24 | ACQ11 |
Validation strategy | 19-11 | ACQ14 |
Verification criteria | 17-50 | ENG2 ENG3 ENG4 |
Verification results | 13-25 | ENG3 SUP2 |
Verification strategy | 19-10 | SUP2 |
Work breakdown structure | 14-09 | MAN3 |
Work product | 21-00 | SUP7 SUP10 |
Work product list | 14-11 | SUP7 |
Work Products by Name A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Work Products by ID 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21
WP ID | WP Name | Process |
01-00 | Configuration item | SUP8 |
01-03 | Software item | ENG7 |
01-50 | Integrated Software | ENG7 |
01-50 | Application Parameter | ENG2 ENG4 |
02-00 | Contract | ACQ12 ACQ13 |
02-01 | Commitment / agreement | ACQ4 ACQ12 ACQ14 PIM3 SPL1 |
03-00 | Data | (unreferenced) |
03-03 | Benchmarking data | MAN6 |
03-04 | Customer satisfaction data | MAN6 |
03-05 | Personnel performance data | MAN6 |
03-06 | Process performance data | MAN6 |
04-00 | Design | (unreferenced) |
04-02 | Domain architecture | REU2 |
04-03 | Domain model | REU2 |
04-04 | Software architecture design | ENG5 |
04-05 | Software detailed design | ENG5 |
04-06 | System architecture design | ENG3 |
05-00 | Goals | PIM3 |
06-00 | User documentation | (unreferenced) |
06-01 | Customer manual | SPL2 |
06-02 | Handling and storage guide | SUP8 |
06-04 | Training material | PIM3 |
07-00 | Measure | (unreferenced) |
07-01 | Customer satisfaction survey | MAN6 |
07-02 | Field measure | MAN6 |
07-03 | Personnel performance measure | MAN6 PIM3 |
07-04 | Process measure | MAN6 |
07-05 | Project measure | MAN6 |
07-06 | Quality measure | MAN6 |
07-07 | Risk measure | MAN5 MAN6 |
07-08 | Service level measure | MAN6 |
08-00 | Plan | PIM3 |
08-04 | Configuration management plan | SUP8 |
08-06 | Project activity network | MAN3 |
08-12 | Project plan | MAN3 SPL1 |
08-13 | Quality plan | SUP1 |
08-14 | Recovery plan | MAN5 SUP8 |
08-16 | Release plan | ENG2 ENG4 SPL2 |
08-17 | Reuse plan | REU2 |
08-18 | Review plan | (unreferenced) |
08-19 | Risk management plan | ENG1 MAN3 MAN5 |
08-20 | Risk mitigation plan | MAN5 |
08-26 | Documentation plan | SUP7 |
08-27 | Problem management plan | SUP9 |
08-28 | Change management plan | SUP10 ACQ11 |
08-29 | Improvement plan | PIM3 |
08-50 | Test specification | ENG6 ENG7 ENG8 ENG9 ENG10 |
08-51 | Technology monitoring plan | ACQ11 |
08-52 | Test plan | ENG6 ENG7 ENG8 ENG9 ENG10 |
09-00 | Policy | (unreferenced) |
09-03 | Reuse policy | REU2 |
10-00 | Process description | ACQ12 PIM3 |
11-00 | Product | (unreferenced) |
11-03 | Product release information | SPL2 |
11-04 | Product release package | SPL2 |
11-05 | Software unit | ENG6 |
11-06 | System | ENG9 |
11-07 | Temporary solution | SPL2 |
12-00 | Proposal | (unreferenced) |
12-01 | Request for proposal | ACQ14 |
12-03 | Reuse proposal | REU2 |
12-04 | Supplier proposal response | SPL1 |
13-00 | Record | ENG1 SUP8 |
13-01 | Acceptance record | SUP7 ACQ4 |
13-04 | Communication record | ACQ4 ACQ11 ENG1 MAN3 PIM3 REU2 SPL1 SUP1 SUP2 SUP4 |
13-05 | Contract review record | SUP4 |
13-06 | Delivery record | SPL2 SUP8 |
13-07 | Problem record | SUP1 SUP2 SUP4 SUP9 |
13-09 | Meeting support record | ACQ4 SUP4 |
13-10 | Configuration management record | SUP8 |
13-13 | Product release approval record | SPL2 SUP8 |
13-14 | Progress status record | ACQ4 MAN3 |
13-15 | Proposal review record | SPL1 |
13-16 | Change request | ACQ4 MAN3 PIM3 SUP2 SUP10 |
13-17 | Customer request | ACQ4 ACQ11 |
13-18 | Quality record | SUP1 SUP2 |
13-19 | Review record | ACQ4 ACQ13 MAN3 SPL1 SUP4 SUP7 |
13-20 | Risk action request | ACQ13 MAN5 |
13-21 | Change control record | ACQ11 ENG1 ENG2 ENG4 SUP10 |
13-22 | Traceability record | ENG2 ENG3 ENG4 ENG5 ENG6 ENG7 ENG8 ENG9 ENG10 |
13-24 | Validation results | ACQ11 |
13-25 | Verification results | ENG3 SUP2 |
13-50 | Test result | ENG6 ENG7 ENG8 ENG9 ENG10 |
14-00 | Register | (unreferenced) |
14-01 | Change history | ACQ11 SUP7 SUP8 |
14-02 | Corrective action register | ACQ11 ACQ12 ACQ15 MAN3 MAN5 SUP2 SUP4 |
14-05 | Preferred suppliers register | ACQ15 |
14-06 | Schedule | MAN3 |
14-08 | Tracking system | MAN5 SUP4 |
14-09 | Work breakdown structure | MAN3 |
14-11 | Work product list | SUP7 |
14-50 | Stakeholder groups list | ACQ11 |
15-00 | Report | (unreferenced) |
15-01 | Analysis report | ACQ4 ENG1 ENG2 ENG4 MAN6 SUP4 SUP9 |
15-03 | Configuration status report | SPL2 |
15-05 | Evaluation report | MAN6 PIM3 SUP9 |
15-06 | Project status report | MAN3 |
15-07 | Reuse evaluation report | REU2 |
15-08 | Risk analysis report | MAN5 |
15-09 | Risk status report | (unreferenced) |
15-12 | Problem status report | SUP9 |
15-13 | Assessment/audit report | PIM3 REU2 SUP4 |
15-16 | Improvement opportunity | ACQ15 PIM3 SUP4 |
15-18 | Process performance report | MAN6 |
15-21 | Supplier evaluation report | ACQ15 |
16-00 | Repository | (unreferenced) |
16-03 | Configuration management library | SUP8 |
16-06 | Process repository | PIM3 |
17-00 | Requirement specification | ACQ11 ACQ12 ACQ13 ACQ14 |
17-02 | Build list | ENG7 |
17-03 | Customer requirements | ACQ11 ENG1 |
17-05 | Documentation requirements | SUP7 |
17-08 | Interface requirements specification | ENG2 ENG4 |
17-11 | Software requirements specification | ENG4 |
17-12 | System requirements specification | ENG2 |
17-50 | Verification Criteria | ENG2 ENG3 ENG4 |
18-00 | Standard | (unreferenced) |
18-01 | Acceptance criteria | ACQ12 |
18-06 | Product release criteria | SPL2 |
18-07 | Quality criteria | SUP1 SUP2 |
18-50 | Supplier qualification criteria | ACQ15 |
19-00 | Strategy | (unreferenced) |
19-05 | Reuse strategy | REU2 |
19-10 | Verification strategy | SUP2 |
19-11 | Validation strategy | ACQ14 |
20-00 | Template | SUP7 |
21-00 | Work product | SUP7 SUP10 |