Fleckner und Simon Informationstechnik GmbH              http://www.FlecSim.de

 

Work Products Index

  

  

Work Products by ID             01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21

 

Work Products by Name        A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

  

WP Name WP ID Process
Acceptance criteria  18-01 ACQ12
Acceptance record  13-01 ACQ4 SUP7
Analysis report  15-01 ACQ4 ENG1 ENG2 ENG4 MAN6 SUP4 SUP9
Assessment/audit report 15-13 PIM3 REU2 SUP4 
Benchmarking data  03-03 MAN6 
Build list  17-02 ENG7
Change control record 13-21 ACQ11 ENG1 ENG2 ENG4 SUP10
Change history  14-01 ACQ11 SUP7 SUP8
Change management plan  08-28 ACQ11 SUP10
Change request  13-16 ACQ4 MAN3 PIM3 SUP1 SUP2
Commitment / agreement 02-01 ACQ12 ACQ14 ACQ4 PIM3 SPL1
Communication record  13-04 ACQ4 ACQ11 ENG1 ENG2 PIM3 MAN3 PIM3 REU2 SPL1 SUP1 SUP2 SUP4
Configuration item  01-00 SUP8 ENG3
Configuration management library  16-03 SUP8
Configuration management plan  08-04 SUP8
Configuration management record  13-10 SUP8
Configuration status report 15-03 SPL2
Contract  02-00 ACQ12 ACQ13
Contract review record  13-05 SUP4
Corrective action register  14-02 ACQ11 ACQ12 ACQ15 MAN3 MAN5 SUP2 SUP4 
Customer manual  06-01 SPL2
Customer request  13-17 ACQ4 ACQ11
Customer requirements  17-03 ACQ11 ENG1
Customer satisfaction data  03-04 MAN6 
Customer satisfaction survey  07-01 MAN6
Data 03-00 (unreferenced)
Delivery record  13-06 SPL2 SUP8
Design 04-00 (unreferenced)
Documentation plan  08-26 SUP7
Documentation requirements  17-05 SUP7
Domain architecture  04-02 REU2
Domain model  04-03 REU2
Evaluation report 15-05 MAN6 PIM3 SUP9
Field measure  07-02 MAN6
Goals  05-00 PIM3
Handling and storage guide  06-02 SUP8
Improvement opportunity  15-16 ACQ15 PIM3 SUP4
Improvement plan  08-29 PIM3
Integrated Software  01-50 ENG7
Application Parameter  01-50 ENG2 ENG4
Interface requirements specification  17-08 ENG2 ENG4
Measure  07-00 (unreferenced)
Meeting support record  13-09 ACQ4 SUP4
Personnel performance data  03-05 MAN6
Personnel performance measure  07-03 MAN6 PIM3
Plan  08-00 PIM3
Policy 09-00 (unreferenced)
Preferred suppliers register  14-05 ACQ15
Problem management plan  08-27 SUP9
Problem record  13-07 SUP1 SUP2 SUP4 SUP9
Problem status report  15-12 SUP9
Process description  10-00 ACQ12 PIM3
Process measure  07-04 MAN6
Process performance data  03-06 MAN6
Process performance report  15-18 MAN6
Process repository 16-06 PIM3
Product 11-00 (unreferenced)
Product release approval record  13-13 SPL2 SUP8
Product release criteria  18-06 SPL2
Product release information 11-03 SPL2
Product release package 11-04 SPL2
Progress status record 13-14 ACQ4 MAN3
Project activity network  08-06 MAN3
Project measure  07-05 MAN6
Project plan  08-12 MAN3 SPL1
Project status report  15-06 MAN3
Proposal  12-00 (unreferenced)
Proposal review record  13-15 SPL1
Quality criteria  18-07 SUP1 SUP2
Quality measure  07-06 MAN6
Quality plan  08-13 SUP1
Quality record 13-18 SUP1 SUP2
Record  13-00 ENG1 SUP8
Recovery plan  08-14 MAN5 SUP8
Register  14-00 (unreferenced)
Release plan  08-16 ENG2 ENG4 SPL2
Report  15-00 (unreferenced)
Repository  16-00 (unreferenced)
Request for proposal  12-01 ACQ14
Requirement specification 17-00 ACQ11 ACQ12 ACQ13 ACQ14
Reuse evaluation report  15-07 REU2
Reuse plan  08-17 REU2
Reuse policy 09-03 REU2
Reuse proposal 12-03 REU2
Reuse strategy 19-05 REU2
Review plan  08-18 (unreferenced)
Review record 13-19 ACQ4 ACQ13 MAN3 SPL1 SUP4 SUP7
Risk action request 13-20 ACQ13 MAN5
Risk analysis report  15-08 MAN5
Risk management plan  08-19 ENG1 MAN3 MAN5
Risk measure  07-07 MAN5 MAN6
Risk mitigation plan 08-20 MAN5
Risk status report  15-09 MAN5
Schedule  14-06 MAN3
Service level measure  07-08 MAN6
Software architecture design  04-04 ENG5
Software detailed design  04-05 ENG5
Software item 01-03 ENG7
Software requirements specification  17-11 ENG4
Software unit  11-05 ENG6
Stakeholder groups list  14-50 ACQ11
Standard  18-00 (unreferenced)
Strategy  19-00 (unreferenced)
Supplier evaluation report  15-21 ACQ15
Supplier proposal response 12-04 SPL1
Supplier qualification criteria  18-50 ACQ15
System  11-06 ENG9
System architecturedesign  04-06 ENG3
System requirements specification  17-12 ENG2
Technology monitoring plan  08-51 ACQ11
Template  20-00 SUP7
Temporary solution  11-07 SPL2
Test plan  08-52 ENG6 ENG7 ENG8 ENG9 ENG10
Test result  13-50 ENG6 ENG7 ENG8 ENG9 ENG10
Test specification  08-50 ENG6 ENG7 ENG8 ENG9 ENG10
Traceability record  13-22 ENG2 ENG3 ENG4 ENG5 ENG6 ENG7 ENG8 ENG9 ENG10
Tracking system 14-08 MAN5 SUP4
Training material  06-04 PIM3
User documentation  06-00 (unreferenced)
Validation results  13-24 ACQ11
Validation strategy  19-11 ACQ14
Verification criteria 17-50 ENG2 ENG3 ENG4 
Verification results  13-25 ENG3 SUP2
Verification strategy  19-10 SUP2
Work breakdown structure  14-09 MAN3
Work product  21-00 SUP7 SUP10
Work product list  14-11 SUP7

Work Products by Name           A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

Work Products by ID               01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21

WP ID WP Name Process
01-00 Configuration item  SUP8
01-03 Software item ENG7
01-50 Integrated Software  ENG7
01-50 Application Parameter  ENG2 ENG4
02-00 Contract  ACQ12 ACQ13
02-01 Commitment / agreement ACQ4  ACQ12 ACQ14 PIM3 SPL1
03-00 Data (unreferenced)
03-03 Benchmarking data  MAN6 
03-04 Customer satisfaction data  MAN6 
03-05 Personnel performance data  MAN6
03-06 Process performance data  MAN6
04-00 Design (unreferenced)
04-02 Domain architecture  REU2
04-03 Domain model  REU2
04-04 Software architecture design  ENG5
04-05 Software detailed design  ENG5
04-06 System architecture design  ENG3
05-00 Goals  PIM3
06-00 User documentation  (unreferenced)
06-01 Customer manual  SPL2
06-02 Handling and storage guide  SUP8
06-04 Training material  PIM3
07-00 Measure  (unreferenced)
07-01 Customer satisfaction survey  MAN6
07-02 Field measure  MAN6
07-03 Personnel performance measure  MAN6 PIM3
07-04 Process measure  MAN6
07-05 Project measure  MAN6
07-06 Quality measure  MAN6
07-07 Risk measure  MAN5 MAN6
07-08 Service level measure  MAN6
08-00 Plan  PIM3
08-04 Configuration management plan  SUP8
08-06 Project activity network  MAN3
08-12 Project plan  MAN3 SPL1
08-13 Quality plan  SUP1
08-14 Recovery plan  MAN5 SUP8
08-16 Release plan  ENG2 ENG4 SPL2
08-17 Reuse plan  REU2
08-18 Review plan  (unreferenced)
08-19 Risk management plan  ENG1 MAN3 MAN5
08-20 Risk mitigation plan MAN5
08-26 Documentation plan  SUP7
08-27 Problem management plan  SUP9
08-28 Change management plan  SUP10 ACQ11
08-29 Improvement plan  PIM3
08-50 Test specification  ENG6 ENG7 ENG8 ENG9 ENG10
08-51 Technology monitoring plan  ACQ11
08-52 Test plan  ENG6 ENG7 ENG8 ENG9 ENG10
09-00 Policy (unreferenced)
09-03 Reuse policy REU2
10-00 Process description  ACQ12 PIM3
11-00 Product (unreferenced)
11-03 Product release information SPL2
11-04 Product release package SPL2
11-05 Software unit  ENG6
11-06 System  ENG9
11-07 Temporary solution  SPL2
12-00 Proposal  (unreferenced)
12-01 Request for proposal  ACQ14
12-03 Reuse proposal REU2
12-04 Supplier proposal response SPL1
13-00 Record  ENG1 SUP8
13-01 Acceptance record  SUP7 ACQ4
13-04 Communication record  ACQ4 ACQ11 ENG1 MAN3 PIM3 REU2 SPL1 SUP1 SUP2 SUP4
13-05 Contract review record  SUP4
13-06 Delivery record  SPL2 SUP8
13-07 Problem record  SUP1 SUP2 SUP4 SUP9
13-09 Meeting support record  ACQ4 SUP4
13-10 Configuration management record  SUP8
13-13 Product release approval record  SPL2 SUP8
13-14 Progress status record ACQ4 MAN3
13-15 Proposal review record  SPL1
13-16 Change request  ACQ4 MAN3 PIM3 SUP2 SUP10
13-17 Customer request  ACQ4 ACQ11
13-18 Quality record SUP1 SUP2
13-19 Review record ACQ4 ACQ13 MAN3 SPL1 SUP4 SUP7
13-20 Risk action request ACQ13 MAN5
13-21 Change control record ACQ11 ENG1 ENG2 ENG4 SUP10
13-22 Traceability record  ENG2 ENG3 ENG4 ENG5 ENG6 ENG7 ENG8 ENG9 ENG10
13-24 Validation results  ACQ11
13-25 Verification results  ENG3 SUP2
13-50 Test result  ENG6 ENG7 ENG8 ENG9 ENG10
14-00 Register  (unreferenced)
14-01 Change history  ACQ11 SUP7 SUP8
14-02 Corrective action register  ACQ11 ACQ12 ACQ15 MAN3 MAN5 SUP2 SUP4 
14-05 Preferred suppliers register  ACQ15
14-06 Schedule  MAN3
14-08 Tracking system MAN5 SUP4
14-09 Work breakdown structure  MAN3
14-11 Work product list  SUP7
14-50 Stakeholder groups list  ACQ11
15-00 Report  (unreferenced)
15-01 Analysis report  ACQ4 ENG1 ENG2 ENG4 MAN6 SUP4 SUP9
15-03 Configuration status report SPL2
15-05 Evaluation report MAN6 PIM3 SUP9
15-06 Project status report  MAN3
15-07 Reuse evaluation report  REU2
15-08 Risk analysis report  MAN5
15-09 Risk status report  (unreferenced)
15-12 Problem status report  SUP9
15-13 Assessment/audit report PIM3 REU2 SUP4 
15-16 Improvement opportunity  ACQ15 PIM3 SUP4
15-18 Process performance report  MAN6
15-21 Supplier evaluation report  ACQ15
16-00 Repository  (unreferenced)
16-03 Configuration management library  SUP8
16-06 Process repository PIM3
17-00 Requirement specification ACQ11 ACQ12 ACQ13 ACQ14
17-02 Build list  ENG7
17-03 Customer requirements  ACQ11 ENG1
17-05 Documentation requirements  SUP7
17-08 Interface requirements specification  ENG2 ENG4
17-11 Software requirements specification  ENG4
17-12 System requirements specification  ENG2
17-50 Verification Criteria ENG2 ENG3 ENG4 
18-00 Standard (unreferenced)
18-01 Acceptance criteria  ACQ12
18-06 Product release criteria  SPL2
18-07 Quality criteria  SUP1 SUP2
18-50 Supplier qualification criteria  ACQ15
19-00 Strategy  (unreferenced)
19-05 Reuse strategy  REU2
19-10 Verification strategy  SUP2
19-11 Validation strategy  ACQ14
20-00 Template  SUP7
21-00 Work product  SUP7 SUP10