F+S HOMEPAGE

www.FlecSim.de

SPICE Version 2.5

F+S HTML Version 1.24

Automotive SPICE

1 Scope
   1.1 Introduction
   1.2 Definitions
   1.3 Terminology
   1.4 Applicable Documents
   1.5 Warning

2 Statement of compliance

3 Process Assessment Model
    3.1 Introduction
    3.2 Process Dimension
    3.3 Capability dimension
    3.4 Assessment Indicators
    3.5 Process Capability Indicators
    3.6 Process Performance Indicators
    3.7 Measuring process capability

4 Process Performance Indicators (level 1)

4.1 Acquisition Process Group (ACQ)

4.1.1 ACQ.3 Contract Agreement
4.1.2 ACQ.4 Supplier monitoring
4.1.3 ACQ.11 Technical requirements
4.1.4 ACQ.12 Legal and administrative requirements
4.1.5 ACQ.13 Project requirements
4.1.6 ACQ.14 Request for proposal
4.1.7 ACQ.15 Supplier qualification

4.2 Supply Process Group (SPL)

4.2.1 SPL.1 Supplier tendering
4.2.2 SPL.2 Product release

4.3 Engineering Process Group (ENG)

4.3.1 ENG.1 Requirements elicitation
4.3.2 ENG.2 System requirements analysis
4.3.3 ENG.3 System architectural design
4.3.4 ENG.4 Software requirements analysis
4.3.5 ENG.5 Software design
4.3.6 ENG.6 Software construction
4.3.7 ENG.7 Software integration test
4.3.8 ENG.8 Software testing
4.3.9 ENG.9 System integration test
4.3.10 ENG.10 System testing

4.4. Supporting Process Group (SUP)

4.4.1 SUP.1 Quality assurance
4.4.2 SUP.2 Verification
4.4.3 SUP.4 Joint review
4.4.4 SUP.7 Documentation
4.4.5 SUP.8 Configuration management
4.4.6 SUP.9 Problem resolution management
4.4.7 SUP.10 Change request management

4.5 Management Process Group (MAN)

4.5.1 MAN.3 Project management
4.5.2 MAN.5 Risk management
4.5.3 MAN.6 Measurement

4.6 Process Improvement Process Group (PIM)

4.6.1 PIM.3 Process improvement

4.7 Reuse Process Group(REU)

4.7.1 REU.2 Reuse program management

5 Process Capability Indicators

5.1 Level 1: Performed process
5.2 Level 2: Managed process
5.3 Level 3: Established process
5.4 Level 4: Predictable process
5.5 Level 5: Optimizing process

Annex A: Conformity to the Process Assessment Model

Annex B: Work product characteristics
Work products Index

Annex C: Terminology

Annex D: Key Concepts Schematic

Annex E: Bi-lateral Traceability

Annex F: Reference Standards